Field Reports

Photos and work logs sent from the site.

calendar_today Today: Sat, Oct 31, 2026
groups
Timed in today 14 workers
receipt_long
Work logs today 3
photo_camera
Photos today 12
share
Shared with client 4 this week
Performed By: All expand_more calendar_month Oct 24 – Oct 31
Second-floor slab rebar tying, about 60% done. photo_camera 7

Second-floor slab rebar tying, about 60% done.

person Ruben Santos Daily Work Log
Client: Visible Oct 31, 2026
Nag-tali ng rebar sa grid B–C, 2nd floor slab. photo_camera 3

Nag-tali ng rebar sa grid B–C, 2nd floor slab.

person Danilo Lim Daily Work Log
Client: Hidden Oct 31, 2026
Installed electrical conduits on the 2nd floor slab. photo_camera 2

Installed electrical conduits on the 2nd floor slab.

person Jessie Tan Daily Work Log
Client: Hidden Oct 31, 2026
Slab formworks installed on grids A–C. photo_camera 5

Slab formworks installed on grids A–C.

person Ruben Santos Daily Work Log
Client: Visible Oct 30, 2026
Nag-cut at install ng marine plywood sa formworks. photo_camera 3

Nag-cut at install ng marine plywood sa formworks.

person Arnel Ocampo Daily Work Log
Client: Hidden Oct 30, 2026
Deformed bars 12mm delivered and checked. photo_camera 2

Deformed bars 12mm delivered and checked.

person Ruben Santos Daily Work Log
Client: Hidden Oct 29, 2026
Plastering of ground-floor CHB walls, east side. photo_camera 4

Plastering of ground-floor CHB walls, east side.

person Mateo Cruz Daily Work Log
Client: Hidden Oct 27, 2026
Scaffolding and shoring posts installed. photo_camera 3

Scaffolding and shoring posts installed.

person Ruben Santos Daily Work Log
Client: Visible Oct 26, 2026